How it works

What the analyser does with your data

From the file your supplier or bureau sends to the figures in the report, step by step. Every finding in the analyser also has a "show calculation and evidence" link with the full working.

You load one half-hourly file per meter. The analyser checks the readings, applies the right calendar for each building (a school, a leisure centre, an office, a library, a depot or a 24-hour site), measures base load and peaks, prices the patterns at your rates, ranks every building across the estate, tests headroom for new load such as heat pumps, and estimates how much solar each building would use. It runs in your browser, so the meter data never leaves your computer.

Engineers checking electrical switchgear with a tablet
The analyser points to where and when. Someone who knows the building works out why.
Want the practical steps? Download the user guide (PDF, 13 pages). It walks you through loading your data, setting opening hours, reading the results and sharing them.

1. Loading the meter files

Each file becomes a site. A council estate usually means dozens or hundreds of half-hourly meters: civic offices, leisure centres, schools, depots, libraries, museums, car parks and more. Load them all at once. Excel (.xlsx, .xls) and CSV both work, in any of the three layouts suppliers, bureaux and monitoring systems use: one day per row with 48 readings, one day per column, or one timestamped reading per row. The analyser shows how it read each file, including whether readings were kWh or kW and what it ignored. Files longer than a year are analysed over the last 12 months by default, while the trend charts use everything.

Meters behind the same connection, such as two incomers on one civic centre, can be grouped so capacity is checked against their combined demand.

2. Checking the readings first

Bad data makes confident-looking wrong answers, so the checks come before any figures:

  • missing half hours are left out, never treated as zero
  • whole days of zeros, and two-hour runs of exact zeros inside normal days, are flagged as likely data faults
  • the two clock-change days and any duplicate dates are held back for you to review
  • isolated spikes far above the normal peak are listed

Each site gets a Good, Check or Poor rating. You can exclude readings you know are wrong, with a note of why, and the note stays with the analysis.

3. The right calendar for each building

New sites start on the civic office preset: open 07:00 to 19:00 on weekdays. Set each building to its own preset in one go: school, leisure centre or pool, library or community centre, depot, market, museum or visitor attraction, or 24-hour site for care homes, control rooms and hostels. Then add term dates, evening lettings and closures. The calendar is marked unconfirmed until you check it, and findings that depend on it carry lower confidence until you do.

4. Base load, and use while closed

Base load is the 5th percentile of valid half-hourly demand: the level the building stays above 95% of the time. In a leisure centre that's pool pumps and air handling; in an office it's IT, lifts, fridges and anything left on. The analyser also charts it month by month, because a step that doesn't follow the weather is often a fault, such as a ventilation setback that stopped working. See base load.

Closed-hours excess is the electricity used outside opening hours above the base load, priced at your rates and split by weeknights, Saturdays, Sundays and bank holidays. Buildings are ranked by it across the estate, so the worst school or office gets looked at first. See out-of-hours use.

5. Costs and annual figures

Costs use the unit rates you enter, flat or by time of day, and leave out standing, capacity and other fixed charges. They're what a pattern costs now, not a promised saving. Annual figures are scaled from the valid hours: marked indicative below about 11 months of good data, and withheld below six.

6. Findings, impact and confidence

Every finding carries two ratings. Impact reflects its cost and share of use. Confidence reflects the data quality, how many comparable days there were and whether the calendar is confirmed. High impact with low confidence means check before you quote it in a cabinet report.

7. Capacity and headroom

Enter the agreed supply capacity in kVA from the bill and a power factor (0.95 if you don't know it). The analyser compares every half hour with it, keeps a safety margin, and reports the firm headroom: the constant extra load that fits in every half hour. You can then test a specific load, such as a 60 kW heat pump running October to April or depot EV chargers overnight, and see how many half hours it would breach. It's an early screen; only the network operator can confirm capacity. See supply capacity and headroom.

8. Solar

The Solar tab overlays a typical UK solar day, scaled to your region, on the building's own readings to estimate how much of a system's output it would use at a dozen sizes. Size solar for this site opens the solar calculator with that summary, so you can draw the roofs and car parks and see cost, savings and payback. The readings themselves are never passed. See sizing solar from half-hourly data.

What it can't tell you

  • A main meter shows when electricity is used, not which plant uses it. Findings are things to check on site.
  • Import meters miss what on-site solar supplies. Load the generation meter as its own file to see total demand.
  • Gas and heat aren't analysed yet, and figures aren't weather-adjusted.
  • Smaller buildings on non-half-hourly meters need their data from the supplier or a smart meter first.
  • Carbon uses one conversion factor for the year, which you choose.

Read next

Try it on your own estate

It's free, there's no sign-up, and nothing is uploaded.