These are the terms council teams meet when they work with half-hourly electricity data and plan decarbonisation: delivery and funding terms such as Re:fit, PSDS and energy performance contracts; heat, solar and grid terms; the measures the analyser reports; and the charges on an electricity bill.
Councils and delivery
- Climate action plan
- A council's plan for reaching its net zero targets, covering its own estate and fleet and, usually, the wider area. More.
- Climate emergency declaration
- A formal council motion recognising the climate crisis, usually with a target date for the council's own emissions to reach net zero. More.
- Concession
- A long contract in which a partner is given the right to deliver and operate services or assets, and takes much of the risk in return. Some council energy partnerships use this structure. More.
- Display Energy Certificate (DEC)
- A certificate showing the actual energy use of a public building, required for larger buildings occupied by public authorities and frequently visited by the public.
- Energy performance contract (EPC)
- A contract in which a provider designs and installs energy measures and guarantees the savings they will deliver. Not to be confused with an Energy Performance Certificate. More.
- Great British Energy (GBE)
- The publicly owned energy company set up by the UK government. It funds solar on schools and other public buildings and leads the Local Power Plan. More.
- Heat network zone
- An area in England designated as one where heat networks are expected to be the lowest-cost way to decarbonise heat. More.
- Investment grade proposal (IGP)
- The detailed design, price and guaranteed savings a provider produces under an energy performance contract before works start. More.
- Local Net Zero Hubs
- Government-funded regional hubs in England that give councils free help to develop net zero projects and attract investment. More.
- Local Power Plan
- The UK government and Great British Energy's 2026 plan for community and local energy, backed by up to £1 billion. More.
- National Wealth Fund (NWF)
- The government-owned investment bank. Among other things it lends to local authorities for clean energy and infrastructure projects. More.
- Public Sector Decarbonisation Scheme (PSDS)
- The government grant scheme, delivered by Salix, that funded heat decarbonisation and energy efficiency in public buildings. No future funding is available beyond projects already awarded. More.
- Re:fit
- A national framework for energy performance contracting, run by Local Partnerships and the Greater London Authority. The current version is RE:FIT 5. More.
- Salix
- Salix Finance, the government-owned body that delivers public sector decarbonisation grants and loans across the UK. More.
- Strategic energy partnership
- A long-term contract between a council and a private partner to plan, finance and deliver a pipeline of decarbonisation projects across an area, rather than one project at a time. More.
- Unmetered supply (UMS)
- Electricity billed from an inventory of equipment and agreed operating hours rather than a meter. Most street lighting is supplied this way. More.
- Zone coordinator
- The body, often a council or combined authority, that will plan and oversee a heat network zone under the zoning regulations. More.
Heat, solar and the grid
- Agreed supply capacity
- The most a site's connection is contracted to draw, in kVA, shown on larger electricity bills. Also called authorised or available capacity. More.
- Coefficient of performance (COP)
- Heat delivered by a heat pump per unit of electricity used. A COP of 3 means 3 kWh of heat for 1 kWh of electricity. Averaged over a season it is the SCOP.
- Combined heat and power (CHP)
- A gas engine that generates electricity on site and uses its waste heat for heating and hot water. Found on some leisure centres and civic buildings; as the grid gets cleaner, its carbon advantage over grid electricity has largely gone.
- Distribution network operator (DNO)
- The company that runs the local electricity network, agrees your supply capacity and approves generation such as solar. The first two digits of the MPAN show which one you are on. More.
- Export limit
- A cap, agreed with the DNO and enforced by a control system, on how much a site's solar or batteries can send back to the network. Usually costs a long-hours building such as a leisure centre little. More.
- Firm headroom
- The largest constant extra load a supply could take in every half hour of the period without going over its agreed capacity less a safety margin. More.
- G99
- The engineering recommendation setting how larger generators, including most larger council solar systems and batteries, apply to the DNO to connect. More.
- Power purchase agreement (PPA)
- A contract to buy electricity from a generator at an agreed rate, often from a solar system a funder owns on your site. More.
- Self-consumption
- The share of a solar system's output used on site at the time it is generated rather than exported. On a long-hours building such as a leisure centre it is usually high. More.
Reading half-hourly data
- Annualised figure
- A yearly total scaled up from the valid readings, used when the data falls short of a full year or has gaps. The analyser withholds it below six months.
- Base load
- The level a site's demand rarely falls below, measured by the analyser as the 5th percentile of half-hourly demand. In a leisure centre it is often more than half the bill. More.
- Closed-hours excess
- Electricity used while a building should be closed, above its base load. Used for offices, schools, libraries and depots, not 24-hour buildings. More.
- Coverage
- The share of expected half-hourly readings that are present and valid.
- Degree days
- A measure of how cold or warm a period was, used to compare heating or cooling energy across periods with different weather.
- Half-hourly (HH) data
- The electricity a meter records in each half hour: 48 readings a day, 17,520 in a normal year.
- Heatmap
- One chart of every half hour in a period, a column per day and a row per half hour, coloured by demand. Also called a carpet plot. More.
- kVA
- Kilovolt-ampere, the unit of apparent power that supply capacity is set in. kVA = kW ÷ power factor.
- kW
- Kilowatt, the rate electricity is being used. A half-hourly reading in kWh divided by 0.5 gives the average kW for that half hour.
- kWh
- Kilowatt-hour, the unit of energy you are billed for. 1 kW for one hour is 1 kWh.
- Load factor
- Average demand divided by peak demand. Leisure centres have high load factors because demand never falls far.
- Low-activity window
- The hours the analyser treats as a 24-hour site's quietest, 01:00 to 05:00 by default, in place of closed hours.
- MPAN
- Meter point administration number: the 13-digit number on the bottom line of the supply number on an electricity bill. More.
- Peak demand
- The highest half-hourly average demand in a period, in kW or kVA. In many council buildings it falls on a cold winter morning; in buildings with cooling, on a hot summer afternoon.
- Power factor
- The ratio of real power (kW) to apparent power (kVA), between 0 and 1. Motors and fans lower it.
On the electricity bill
- Capacity Market (CM)
- A scheme paying providers to keep reliable capacity available, charged on use between 4pm and 7pm on working days from November to February. More.
- Climate Change Levy (CCL)
- A tax per kWh on energy used by businesses and public bodies. More.
- Distribution Use of System (DUoS)
- Charges for using the local network, set by the DNO: unit rates by time band, capacity charges and daily charges. More.
- Market-wide half-hourly settlement (MHHS)
- The move to settle every electricity meter in Great Britain on half-hourly data. More.
- Non-energy costs
- Everything in the electricity price apart from the wholesale energy: network charges, policy costs and taxes. More.
- Profile class
- The first two digits of the top line of the supply number. 00 means the supply is settled half-hourly. More.
- Transmission Network Use of System (TNUoS)
- Charges for the national high-voltage network, mainly a fixed daily charge per site for business supplies. More.