This leisure centre spends about £119,000 a year on load that never switches off, because pool pumps and pool hall air handling run around the clock. From September that load stepped up by about 18 kW when the pool hall plant stopped setting back at night. The supply has room for a 60 kW heat pump through the winter but not a 90 kW one, and the centre would use every unit from a solar system of up to about 180 kWp.
The building
A council-owned leisure centre with a 25 metre pool, a learner pool, a four-court sports hall, a gym and a cafe, on one half-hourly meter. It's open 06:00 to 22:30 on weekdays and 07:00 to 20:00 at weekends and on bank holidays, and busiest on weekday evenings. Pool filtration, circulation and the pool hall air handling run around the clock. Gym cooling adds load on summer afternoons.
The headline figures
| Measure | Value | What it means |
|---|---|---|
| Electricity a year | 829,765 kWh | Scaled from 363 days of valid readings. The two clock-change days are held back. |
| Energy cost a year | £207,441 | At a flat 25p/kWh, before standing and capacity charges |
| Base load | 54.5 kW | The level demand rarely falls below across the whole year |
| Share that is base load | 58% | About £119,000 a year of continuous load |
| Used while closed | 26% | Of all electricity, overnight and before opening |
| Busiest half hour | 155.3 kW | 16 July 2024 at 18:00, in a hot spell |
A pool never really closes: water has to be filtered and the pool hall kept dry around the clock. So the questions that matter are what's in the base load, whether it's moving, and how much room is left on the connection for a heat pump.
Finding 1: base load stepped up in September and stayed up
The yearly base load of 54.5 kW hides a change. The base load by month chart shows it:
| Month | Base load | Month | Base load |
|---|---|---|---|
| Apr 2024 | 55.9 kW | Oct 2024 | 72.7 kW |
| May 2024 | 54.0 kW | Nov 2024 | 74.3 kW |
| Jun 2024 | 52.8 kW | Dec 2024 | 75.3 kW |
| Jul 2024 | 52.3 kW | Jan 2025 | 76.4 kW |
| Aug 2024 | 52.5 kW | Feb 2025 | 76.1 kW |
| Sep 2024 | 70.2 kW | Mar 2025 | 74.4 kW |
Between August and September the base load rose by about 18 kW. The weather barely changes between those two months, so this isn't heating. Some of the later rise is seasonal, but a step that size in one month points to something that started running and didn't stop.
The heatmap shows where: from 2 September, the hours the centre is closed are darker (higher demand), while opening hours look the same as before. In our made-up story, a controls change over the summer left the pool hall air handling at its daytime rate overnight, and the pool covers stopped going on at night, so the dehumidifiers worked harder. The analyser prices closed-hours use above its reference at about £12,400 a year.
It doesn't show up as an unusual day, because each day only moves a little. That's why the monthly base load chart is worth checking on every pool.
Finding 2: summer sets the peak, winter sets the heat pump limit
The busiest half hours fell in the hot week of 15 to 19 July, on weekday evenings when the gym and sports hall were full and the cooling was working hardest. The peak of 155.3 kW is about 163 kVA at an assumed power factor of 0.95, which is 65% of the 250 kVA agreed capacity. Holding back a 10% margin leaves 225 kVA usable.
The largest constant load that fits in every half hour of the year is about 58 kW. A pool heat pump runs mainly from October to April, so the analyser's headroom test lets you check a load in the heating months only:
- A 60 kW heat pump, running around the clock from October to April, fits. The highest half hour with it added is about 215 kVA against 225 kVA usable. That's tight.
- A 90 kW heat pump doesn't fit. It would go over the usable capacity in 923 half hours on 149 days, by up to 21 kVA, mostly on winter weekday evenings. That needs a capacity increase from the network operator, a smaller heat pump with a buffer, or controls that hold it back at peak times.
This is the check to run before anyone designs a heat pump to replace the pool boilers. See supply capacity and headroom and leisure centres and pools.
Finding 3: it would use every unit of a well-sized solar system
A leisure centre is open long hours seven days a week and the pool plant runs all day, so there's a lot of daytime demand to soak up solar. At UK average output (905 kWh per kWp a year), the analyser estimates:
| System size | Output a year | Used on site | Share of centre's use |
|---|---|---|---|
| 184 kWp | 164,919 kWh | 100% | 20% |
| 276 kWp | 247,378 kWh | 94% | 28% |
| 551 kWp | 494,756 kWh | 64% | 38% |
| 919 kWp | 824,683 kWh | 44% | 44% |
Up to about 180 kWp, the centre would use all of it. Few leisure centre roofs take much more than that, so the limit is usually space and roof condition, not demand. A car park canopy is often the way to add more. See solar on council buildings, then open the solar calculator from the analyser's Solar tab to cost a system.
What we'd do next
- Take the base load step to the operator and the BMS contractor. Restore the pool hall night setback and the pool cover routine, then load the next three months of data to confirm the base load has dropped back (see proving a saving worked).
- Look for other continuous load. Even at 54.5 kW, base load is 58% of the bill. Check variable speed drives on pool pumps, filtration turnover rates at night, and lighting in the pool hall and car park.
- Confirm the agreed capacity on the bill before anyone designs a heat pump, and get the 90 kW option priced with and without a capacity increase.
- Size solar to the roof and car park you have. On this profile, all of it would be used on site.
- Do the same for every building. A leisure centre like this is often the single biggest electricity user on a council estate. Load the rest of the estate to see where it ranks.
Questions people ask
Is this real data?
No. We made up the leisure centre and its readings so we could show the method without using anyone's real data. Every figure is what the analyser reports for the example file.
Why is the base load so high?
Because pool filtration, circulation and the pool hall air handling run around the clock. Some of it has to; the question is how much, and whether it drops at night when the pool is covered.
Can I run the same checks on my own leisure centres?
Yes. Ask your supplier or the operator for a year of half-hourly data for each meter, load it into the analyser, set the leisure preset and enter your agreed supply capacity. It runs in your browser and nothing is uploaded.
Are these figures savings?
No. They're what each pattern costs now at 25p/kWh. A saving depends on what you change, and should be confirmed from the meter data afterwards.